Dear PCS Support,
I created a detailed master/slave dossier (i.e. the calendar of the operation points in the master is not empty). The master runs daily from THUN to Emmerich Grenze (via Koeln Hbf). On the last part of the track I created a subsidiary which runs on Sundays from 'Koeln Hbf' to 'Emmerich Grenze'. In the subsidiary I skipped the operation point 'Osnabrueck Hbf', so the train will not run to 'Osnabrueck Hbf' on Sundays. This is shown correctly in the PCS GUI, but the bitfield for 'Osnabrueck Hbf' in the notification 'notifyDossier' still contains the value 1 for Sundays, which is wrong.
We rely on the correct bitfield of the operation points in the notifications and we belive this is an issue on your side. Could you please analyse this? Dossier 129137 on pfcoretest.
Thank you in advance!
Kind regards,
Dinel Toader
Software AG, im Auftrag von
DB Netz AG
Bitfield and calendar view was different between GUI and notification
We found that PCS IP has a problem calculating the complementary calendar for this specific case.