Milestone: Limit for answering path study requests 2020
When:
Monday, Mar 16, 2020,
23:59
Where:
Mar
16
Automatically switching all dossiers which are in Feasibility Elaboration Conference to Harmonization – IMs/ABs lights may be green, yellow, red or blue (IMPORTANT: the Feasibility Study Result will be treated in the system as ‘acknowledged’).
In case a feasibility study cannot be completed by the IM/AB in due time, and the dossier should not yet automatically be switched to Harmonisation on 16/03/2020 at 23:59 h, the IM/AB has to switch this dossier manually from Feasibility Elaboration Conference to Feasibility Study Elaboration before 16/03/2020 at 23.59 h. Afterward, the switching from Feasibility Study Elaboration to Feasibility Study Result has to be done manually by the coordinating IM/AB.