Automatically switching all dossiers which are in Feasibility Study Elaboration Conference to Harmonization – IMs/ABs lights may be green, yellow, red or blue (IMPORTANT: the Feasibility Study Result will be treated in the system as ‘acknowledged’).
In case a feasibility study cannot be completed by the IM/AB in due time, and the dossier should not yet automatically be switched to Harmonisation on 12/03/2018 at 23.59 h, the IM/AB has to switch this dossier manually from Feasibility Study Elaboration Conference to Feasibility Study Elaboration before 12/03/2018 at 23.59 h. Afterwards, the switching from Feasibility Study Elaboration to Feasibility Study Result has to be done manually by the coordinating IM/AB.