PCS EC Sprint 58

Submitted by Anna Géczi on 9 July, 2020 - 11:40
Basic
Description
Summary
KeyBrief descriptionIssuer type
RNE014-3669PaP dossier issue:
- Dossier: 222000; user:vpe
  Use case: add a new sub-path and after that edit the calendar of already existing sub-path with PaP
  Problem: This case was handled in the same way as the adding of a new sub-path. As a result of that, this "new" sub-path had the same calendar as subpath with PaP. When calendar switching was applied, the calendar of sub-path with PaP became empty and was removed and a new tailor-made sub-path was created. -> fixed 
- Dossier: 221532; user: sncf-r
  Use case: add a new sub-path and after that edit the calendar of already existing sub-path with PaP (add additional days + cut some of the days)
  Problem: Adding of additional days resulted in triggering combined PaP. Also, this case was handled on the same way as adding of new sub-path
  (whereas template was used previously added sub-path). As a result of that, we get a sub-path where the route was the same as the one that was created before this action and the calendar switch was applied on the sub-path with PaP. -> fixed 
Bug
RNE014-3668Partial harmonization:
Máté: I received a remark from Freddy for the partial offers. He says that after Infrabel triggered partial offer, when he logged with the RU, he could change the light also in the pair with Path Elaboration.

Tested dossier: https://pcstest1.rne.eu/pcs/#/app/dossier/218163/control
Analysis:
dossier id: 218163; user: infrabel/railtraxx (test1)
The dossier has the following structure:
T1: RailTraxx/Prorail (Path Elaboration)
T2: RailTraxx/Infrabel (Observation)
T3: Lineas/Infrabel (Observation)
Story
RNE014-3675Partial harmonization - Delete a sub-path not working:
Ticket info: https://ts.railneteurope.info/otrs/index.pl?Action=AgentTicketZoom;Ticke...
Analysis
dossier: 222239; user: sncf-r
There was an error for partially harmonized dossiers on path section removal and sub-path removal when check for NPR dossiers in PE or PP was performed (dossier status and process type should be resolved from responsible pair of the selected territory, not from dossier state).
Story
Details
Taken in Patch Release
Wednesday, 8 July, 2020