Interfaces / Prescriptions

Main Tasks of the Interface / Prescriptions sub-WG

Kepp same ergonomics everywhere, one producer dependency reduction, neutrality for the user (signaler/train driver), without any additional equipment on the user side.

  • Define the interfaces and conventions between GSM-R and translation tool as well as between the translation modules. Keep the same ergonomics everywhere, one producer dependency reduction, neutrality for the user (signaler/train driver), without any additional equipment on the user side.
  • Set up the requirements for an interface environment
  • Prepare Location analysis – user scenarios and possible location in the GSM-R
  • Design the process and information flow of the applications
  • Define the technical specifications for communication between GSM-R and the language tool
  • Define the interfaces with other IM/RU/RNE systems
  • Analyse Decentralised / Centralised provider solutions
  • Analyse the possibility of covering the language tool by TSI CCS
This is a closed group. Only a group administrator can add you.

There is no content in this space.