Use aggregated timetable for conflict detection

We checked during the demo the following scenarios:

  • Catalog vs. Catalog
  • Band vs. Band
  • Band vs. Catalog
  • TCR vs. Band
  • TCR vs. Path

We have performance issue when we filter for the overlap on station. We have to check that issue, it will be on the next sprint too.

It has to be checked, how we call or whether we shall detect the case, when a slot path is overlapping with its own band. Currently, we call it as an overlap on station.

Appearance of path with offset on Atlantic line

The problem disappeared with the update of the line. Anyway, the offset issue is solved. It was there only for the path, but it's fixed now, deployed to staging.

Chart render problem

TCRs caused the trouble, but it's fixed and deployed on staging.

0:00 times for Bands

It was not possible to enter 00:00 for bands in the first row, not it is.

  • Catalog vs. Catalog
  • Band vs. Band
  • Band vs. Catalog
  • TCR vs. Band
  • TCR vs. Path

We have performance issue when we filter for the overlap on station. We have to check that issue, it will be on the next sprint too.

It has to be checked, how we call or whether we shall detect the case, when a slot path is overlapping with its own band. Currently, we call it as an overlap on station.

Hogy hívjuk azt, amikor a slot catalog átfed a rászerkesztett banddel? Most overlap on station.

Appearance of path with offset on Atlantic line

The problem disappeared with the update of the line. Anyway, the offset issue is solved. It was there only for the path, but it's fixed now.
Deployed to staging

Másold be a hibát az e-mailből.

Chart render problem

TCRs caused the trouble, but it's fixed and deployed on staging.

0:00 times for Bands

It was not possible to enter 00:00 for bands in the first row, not it is.

Two points crossing line presentation problem

I created two lines and paths for each.

  • mba line 1
  • mba line 2

They cross each other twice, once at loc2 and once at loc4. According to a recent dev, the path on the line 2 shall not be shown between loc2 and loc3. Check https://ecmt.staging.i0.hu/path/283 on the chart.

The problem is fixed now and available on staging.

Continuous TCR presentation problem

For one day continuous TCR, the tool showed a wrong presentation (it's shown on the previous picture). Now it's fixed too.

Next sprint

  • Overlap on station performance issue
  • Potential conflicts testing with offsets
  • Multiple-crossing objects with offset
  • Think about how to work with dense lines -> according to the input on Atlantic pilot
  • And we will start the planning for 2021 keeping in mind the TTR IT pilot and the system pre-conditions (such as XML import)